Plagued by frequent shutdowns, in 2021 Naipu Mining Machinery provided third stage pumping station tailings delivery system solution for Carmen Copper Mine, that is between the stage 2 pumping station and the highest point of 525 meters, new built Level 3 pumping station,used 4pcs NZJAHPP300 centrifugal slurry pumps in series, used four-stage string tailings conveying system, PLC control system, more than 1000M long steel rubber composite pipeline, the total lift reaches 200M, the most in Asia.
The phase 1 of the project be completed and put into operation in early 2021, and after two years of stable operation,the scheme of centrifugal slurry pump of Naipu Mining Machinery has been proved effectively. First, it solves the problem of unstable operation of the original diaphragm pump tailings system, and second, the life of the wearing part of the centrifugal slurry pump has been greatly improved, the lifetime of the wearing part of the original diaphragm pump is 1-2 weeks, but the lifetime of the wearing part of the slurry pump of Naipu Mining Machinery as long as 8-10 months.
The lifetime of wearing parts is greatly improved